Company News

Measures For Ceramic Particle Dropping

2022-10-26

Accompanied by the increase in ceramic particle project, it has become the dominant city construction in the city. However, the particles dropped after construction, not only the user experience is poor, but also the construction cost was wasted. The solution is as follows: A: The ratio of glue to particles used in the ceramic particle track is not up to the standard, that is, too little glue and too many particles, resulting in insufficient relative adhesion of the glue.

Solution: Prepare up-to-standard ratio and use high-quality glue to improve the bond between the two.

B. Check whether the purity of the ceramic particles is up to the standard. If the purity of the particles is not up to the standard, it will cause peeling and fall off after exposure to the sun.

Solution: Choose reliable manufacturers to buy high-purity ceramic particles. Don't ignore the losses after construction because of the low prices given by some small workshops.

C. When using a plastic track, check whether there is any damage to the plastic track, such as running shoes with long nails, high-rooted shoes with pointed roots, etc.

Solution: Find someone to look at the venue, and write that products with damaged ceramic particles and plastic tracks are not allowed to enter.

D.The plastic runway has been built for a long time and is slowly aging.

Solution: Strengthen daily maintenance and deal with aging areas in time.

In order to prevent the ceramic particles from falling off, we can choose a small piece of land for trial construction, confirm that there will be no problems, and all kinds of preparations meet the standards, and then carry out large-scale construction, so as to control the cost and prevent Cause unnecessary waste.




X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept