Generally used in highways, tunnels, bridges, urban bus lines, various ramps, overpasses, pedestrian bridges, bicycle landscape paths, community roads and parking lots, etc.
Colored non-slip pavement at crossroads
Preparations for color non-slip pavement construction:
(1) Ensure that the construction road is level, clean, free of any pollutants, and no road damage;
(2) Clean up road dust and obstacles;
(3) Appropriate fillers can be used to repair deep pits or small holes (empty) on the road;
(4) Use appropriate cleaning agents to clean up road oil or dirt, then rinse with water, and wait for complete drying before construction;
(5) Before construction, it must be ensured that the road surface is dry. The wet road surface can be dried with a hot compressed air machine. Especially in winter, the road surface must be heated and the resin condensation must be accelerated;
(6) In the construction area, seal the edges with kraft adhesive paper or tape, and then measure the area of the construction area in order to calculate the amount of resin construction;
(7) The best construction temperature of the road surface is between 15-35℃.