Ceramic Aggregate Construction Conditions

2022-10-26

1. New asphalt pavement: It is not recommended to construct on a new asphalt surface, it should be 3 to 4 weeks of vehicle operation time. In order to solidify and stabilize the pavement asphalt. (No primer needed)

2. New cement pavement: After 28 days of activation, the new cement pavement is then mechanically polished to remove the floating cement surface.